The wind farm is being developed by Moray Offshore Windfarm East Ltd (MOWEL) which is a joint venture company owned by Diamond Green Limited (33.4%), EDPR (33.3 %), ENGIE (23.3%) and CTG (10%).
In May 2019, the firm contracted GeoSea NV Geotechnical & Offshore Solutions to carry out pile foundation installation at the site, which is 22 kilometres off the Aberdeenshire coast in Scotland.